Dungeness Power Station Storage Facility

The Dungeness project underscores Jager’s capability to deliver complex refurbishments under demanding environmental and safety constraints, ensuring reliable operations for critical infrastructure.

Project Details:

Client: Walker Construction (UK) Ltd
Duration: 5 months
Location: Dungeness, Kent, UK

Objectives


  • Rewire the old hall and install new distribution equipment within five months

  • Provide efficient lighting and power tailored to storage operations

  • Ensure compliance with site-specific safety procedures

Scope of Works


  • New 500 A incoming supply and main distribution board

  • Sub-distribution via TPN and SPN boards for lighting, power and plant feeds

  • High-efficiency LED strip and bulkhead luminaires with integral emergency modules

  • Galvanised steel trunking and ladder rack containment

  • General-purpose sockets and dedicated circuits for plant equipment

  • Emergency escape lighting and illuminated signage

  • Enhanced earthing and bonding to site requirements

Key Challenges

  • Maintaining segregation and controlled access in an active works environment

  • Routing cables to minimise disturbance to protected wildlife habitats

  • Installing equipment within limited headroom and tight spaces

Outcomes & Benefits

  • Completed and commissioned on schedule with zero defects

  • Distribution network designed for 20% future load growth

  • Improved safety metrics through upgraded containment and emergency lighting