Storex Self Storage, Loughton
The Storex Self Storage project demonstrates Jager’s ability to deliver comprehensive, sustainable electrical solutions under tight deadlines, supporting client goals for efficiency and security.
Project Details:
Client: Modus Construction Consultants Ltd
Duration: 6 months
Location: Loughton, Essex, UK
Objectives
Deliver full electrical design and installation within six months
Incorporate renewable energy infrastructure for sustainability
Provide robust security and life-safety systems tailored to self-storage operations
Scope of Works
Energy-efficient LED internal and external lighting
Rooftop PV array with inverter infrastructure (battery-ready)
Main 400 A incoming supply and bespoke distribution board
Sub-distribution via TPN boards to each floor
Automated barrier entry with proximity readers
CCTV covering corridors, entrances and perimeter
Addressable fire-alarm system, AOV integration and disabled refuge intercom
Lightning protection and enhanced earthing
Key Challenges
Accelerated design, procurement and installation within a six-month window
Safe access at height for PV and upper-floor installations
Coordinating electrical works alongside cladding and fit-out trades
Outcomes & Benefits
Achieved full commissioning by the client’s opening date
PV installation and LED lighting forecast to cut annual energy use by over 25%
High-security systems ensuring tenant protection and operational reliability