Dover Discovery Centre

Scope of Works





Electrical Distribution





Installation of bespoke 800 A switch-fused isolator and main panel board



Sub-distribution via split-metered TPN distribution boards for lighting and power



Containment & Cabling





Supply and erect containment systems throughout new and refurbished zones



Pull and terminate multimode fibre and CAT6 data cabling for IT and AV networks



Lighting Systems





Internal LED lighting with daylight and presence controls



External façade and landscape illumination



Emergency luminaires and escape-route signage



Small Power & Data





General-purpose outlets and dedicated circuits for catering, AV and exhibition areas



Structured cabling for network, telephone and AV systems



Life-Safety & Protection





Fire alarm installation, including detectors, call points and sounders



Automatic Opening Vents (AOV) integration with fire control system



Disabled refuge and intercom system



Lightning protection, earthing and bonding upgrades



Security & Access Control





Access control with proximity readers at all external doors



CCTV coverage of public areas, back-of-house zones and perimeter



Intruder and panic-alarm panels linked to remote monitoring

4. Key Challenges





Phased Handover: Coordinating electrical shutdowns to suit multiple trades without delaying each other.



Space Constraints: Fitting large distribution equipment into limited plant-room footprints.



Technical Interfaces: Ensuring seamless integration of security, fire and building management systems.



Quality and Compliance: Maintaining strict adherence to British Standards under an accelerated schedule.

5. Solutions & Innovations





Collaborative Planning: Weekly coordination meetings with Walker Construction, M&E consultants and other subcontractors to programme shutdowns and handovers.



Custom-Designed Enclosures: Worked with fabricators to produce bespoke meter-cubicles, maximising space while achieving IP rated protection.



Intelligent Control Systems: Deployed networked lighting controls that adapt to daylight levels, reducing energy consumption by up to 35 %.



Integrated Testing Protocols: Developed a unified test schedule covering electrical, fire and security systems, dramatically reducing commissioning time.

6. Outcomes & Benefits





On-Time Delivery: Completed all electrical works within the 14-month programme, enabling the centre to open as planned.



Enhanced Reliability: New power distribution system rated for future expansion and high-availability operation.



Improved Energy Efficiency: LED lighting with smart controls delivers significant reductions in operational costs.



Robust Safety and Security: Fully compliant fire and security systems ensure occupant protection and peace of mind.



Client Satisfaction: Walker Construction (UK) Ltd praised Jager Electrical for professionalism, attention to detail and effective collaboration.

7. Conclusion

The Dover Discovery Centre project showcases Jager Electrical Contractors Ltd’s ability to deliver complex, large-scale electrical installations on time and to exacting standards. By combining technical expertise with proactive project management, Jager Electrical not only fulfilled the client’s requirements but also contributed valuable energy-saving measures and operational resilience. The successful partnership with Walker Construction (UK) Ltd underlines our commitment to excellence and our reputation as a trusted electrical contractor in the built environment.

The Dover Discovery Centre refurbishment highlights Jager’s expertise in executing complex, multi-system electrical upgrades on a major cultural facility, achieving all client objectives and certification requirements.